How Insituform® CIPP is Installed

Click on the links below to view an animation of the Insituform® CIPP process.

CIPP Animation


The Process
1. A resin impregnated tube is inserted within the existing tube.CIPPstage1.final.jpg
CIPPstage1a.final.jpg


CIPPstage2.w_arrows.jpg
2. Next, hot water or steam is used to cure the resin, forming a smooth corrosion resistant structural lining that fits tightly against the internal wall of the original pipe.






CIPPstage3.final.jpg
3. Service laterals are restored internally with robotically controlled cutting devices. The rehabilitated pipe can be inspected by closed-circuit TV.






Click here to view Insituform CIPP brochure.